The Commons at Timber Creek | Two 13,020 SF Flex Space Office/Warehouses | Friendswood, TX

Construction is complete on these Industrial Suites. 

C54CBE82 2B9F 4831 844B 58184C1D70D4 copy

1AC79FFA 136C 4CF4 978E 0E538F1E99B6

297CA0BA 7425 418D AFCA 30611961E5A0 copy

EFA20993 182E 4C41 9EAB 4C3B78D3F3E5 copy

7.17.23 - The stucco and stone is complete. Crewmen are installing glass.

IMG 6165 copy

IMG 6166 copy

IMG 6167 copy

IMG 6168 copy

IMG 6169 copy

IMG 6173 copy

IMG 6174 copy

 

4.14.23 -The masons started their work on the stucco. This project is on schedule to be completed in May.

1

 

3.01.22 - Erectors continue to hang steel. The framing crews began framing the front facades. The paving crew will start pouring the paving soon,

15 copy

14 copy

16 copy

 

12.02.22 - Crews began sheeting the buildings,

6

1

12

 

11.17.22 - Crews are erecting the first of the 12,000 SF flex office/warehouse spaces,

Commons4 copy

 

11.06.22 - Crewmen poured the first pad for this project. Spaces are available for sale or lease and range from 3,000 SF to 12,000 SF.

02 copy

01 copy

COMMONS 1 copy

3 copy

Friendswood4 copy

Friendswood3 copy

Big City Manufacturing | 23,000 SF | Friendswood, TX

1.23.24 - Final clean is complete. Landscaping is installed.

0BD6C680 52A8 4787 8BEF A644FB29AC8E copy

797FAD6A C23E 4A68 B2E7 D90FC9C38964 copy

884C688C 603B 4BDB 89EA 9C98ED21AA07 copy

939DEC6C 288A 4EE4 954C 20C25338B881 copy

C331B695 3575 49DB 86F5 DCABC72FF462 copy

31035EC2 0FEB 4E42 A95D AF30549D04F9 copy

61D807FB CAFD 4AE1 A6BA 6770C95B70D8 copy

 

 

D3AA3738 4014 4D82 95B0 3C1DD4069A3A copy

D81F2F89 F9BA 433B A89C 29C492DC3C6A copy

F490AF31 9C19 4F45 8F5D F92E54F27F3E copy

04208C60 FE41 40AC AC2D 6ABBBB3455FE copy

BF53357C 94CF 4F2D 9D91 8F5C71965574 copy

122E8930 ADA4 48CA 902B 62E5E69ACBCD copy

81F10C2A 4D7A 4063 8C28 994E01EC4E7C copy

 

12.14.23 - Parking area striping is complete,

09AE6B39 8AB1 45C5 ADF8 561E57D210AD copy

9AF3ACD3 CF26 4ACC 9DC4 941AE688EF56 copy

36E4F666 9456 4E39 8271 415C602837BB

3066A27C 1B03 4852 B0A9 919768EA95F1 copy

525669C0 C0A1 4694 9C1A FF83070A442D copy

 

11.29.23 - Glass installation is complete and the ceilings are installed. Power should be turned on next with an expected completion set for next month,

IMG 7242 copy

IMG 7234 copy

IMG 7236 copy

IMG 7237 copy

IMG 7238 copy

IMG 7239 copy

IMG 7240 copy

 

10.25.23 - Interior crews are hanging sheetrock. Concrete crewmen are getting ready to pour the equipment pad,

IMG 7097 copy

IMG 7096 copy

IMG 7095 copy

IMG 7094 copy

IMG 7093 copy

IMG 7092 copy

IMG 7091 copy

IMG 7090 copy

 

7.25.23 - Crews poured the foundation this morning.

IMG 6281 copy

IMG 6272 copy

 

7.20.23 - Crewmen are preparing for next week's pour,

image11 copy

IMG 6222 copy

IMG 6218 copy

 

5.25.23 - Crews are breaking ground on Big City Manufacturing's new facility in Industry Park. This Design/Build project includes a fully air conditioned shop and 3,000 SF of finished office space,

20223 Binford Flipped.jpg copy

IMG 5673.jpg copy

IMG 5676.jpg copy

SiteOne Expansion | 12,000 SF | Friendswood, TX

1.23.24 - This project is complete,

6C25955D B083 42AE 9C26 2CA7250A7554 copy

44C23466 4822 4B40 9B5C 24DE05500C1A

81E6EF1E 68B6 49E4 AF8D CF63E30F6433 copy

 

12.14.23 - M&M Erectors continue to sheet the building,

2AF6A487 99CC 4D15 95B0 1FA381041CBB copy

4EC6DBF7 6771 4738 A6F6 E117E473EFD1 copy

739F5833 B49B 4B07 A2A1 06681B853954 copy

57759ABC A2F6 41B0 A5E5 E2CDD08948F2 copy

31701325 9D7B 44D2 B02E 113E373C05A7

 

11.29.23 - The paving was poured this morning and erectors are hanging steel,

IMG 7243 copy

IMG 7245 copy

 

11.03.23 - The slab is poured for the new 12,000 SF expansion of their Friendswood location. The concrete crew is laying out the paving and the erectors will begin hanging steel next week.

IMG 7170 copy

IMG 7169 copy

IMG 7167 copy

IMG 7166 copy

IMG 7165 copy

 

Katy Industrial Suites | 23,660 SF New Custom Office Condos | Katy, TX

12.15.23 - The Katy Commercial Suites are finished and are available for Lease or Sale. Spaces range from 2,088 SF to 12,529 SF,

1000093261

1000093260

 

10.04.23 - The landscaping is scheduled for this week, and the power is to be turned on this week.

IMG 6913 copy

IMG 6916 copy

IMG 6917

IMG 6918 copy

IMG 6919 copy

IMG 6921 copy

IMG 6923 copy

 

4.20.23 - The last of the paving was poured last night. Erectors continue to sheet the buildings,

IMG 2023 04 20 01 40 57 974 copy

IMG 2023 04 20 02 29 28 189 copy

 

3.22.23 - Erectors began hanging steel this week. Half of the paving was poured this morning,

katy industrial suites 1 copy

katy industrial suites 2 copy

 

10.13.22 - Site crewmen broke ground this week on the Katy Industrial Condos. Crewmen have scraped the site and are beginning the pads,

1 copy

2 copy

3 copy

4 copy

 

9.22.22 - Our crews are breaking ground this week on a new Industrial Condominium project in Katy, TX. Two 11,830 SF units are under construction in the Katy-Hockley Business Park Development (4107 and 4109 Katy Hockley Rd). The condominiums will total 23,660 SF and will be ready Q2 2023.

02 copy

01 copy

03 copy

Independence Business Park Phase 3

7.17.23 -  Site crews began to scrape the site for the third phase of the Independence Business Park for Finial Group. We are building three office / warehouse buildings total (Building 2, Building 6, and Building 7, each being pre-engineered metal buildings with horizontal architectural panels and limestone offices. Bldg 2 will be 46,378 SF with a 2,855 SF office. Building 6 will be a 18,525 SF crane-ready building with a 2,025 SF office, and Building 7 will be a 25,425 SF crane-ready building with a 2,025 SF office.

image3

Big Industry Boat and RV Storage | 100,000 SF | Friendswood, TX

Construction of these storage units is complete,

B732D5FF DF64 4CFD A272 06183533978E copy

4D48B492 AB4D 4B85 98C5 A2422E57E81B copy

337F9C28 C444 4A1B 911C 9824A9B48A47 copy

1873F435 7E40 414F A0F3 E56E2D339286 copy

4848A412 5889 4A10 A47D 000F016DA29B copy

A5DA13F9 8877 4941 84F7 2CD1EC967E8E copy

D540CB38 DF58 47DA 83E0 15D0D0A9D0F5 copy

E1A1BC64 85FA 4188 B07D CB41EA70F00A copy

 

4.14.23 - Crews are hanging steel for the next storage unit,

DJI 0019 copy 

DJI 0023 copy

 

3.01.22 - The first two buildings are fully sheeted and trimmed. Sheeting continues on the third storage unit,

4 copy

5 copy

12.02.22 - This boat and RV storage park will include 100,000 SF of storage within a total of 13 buildings. The first two buildings are poured,

7

8

9

Humble Sign Co. | 35,722 SF | Humble, TX

5.25.23 - Interior crews continue to hang sheetrock. The paving crew is laying out the remainder of paving to be poured,

1 copy

2 copy

3 copy

4 copy

5 copy

6 copy

6 copy

7 copy

8 copy

9 copy

10 copy

11 copy

12 copy

13 copy

 

3.08.23 - Erectors completed their work hanging the steel. The fire sprinkler contract are hanging pipe. The dirt crewmen are cutting grades,

9 copy

8 copy

7 copy

6 copy

5 copy

4 copy

3 copy

2 copy

1 copy

 

2.08.23 - M&M Erectors are hanging steel for the new facility,

humblesign2.08

humblesign2.08 2

 

1.17.23 - Crews are pouring the foundation for Humble Sign’s new 35,722 SF facility. Their new facility includes a two-story office and a crane-served warehouse for manufacturing. We built for Humble Sign in 2018 and are excited to be working with them again.  

10

4

2

Webb's Automotive | 2,500 SF Free-standing Oil Service Center | Cypress, TX

3.09.23 - We enjoyed being a part of Webb's Automotive ribbon cutting yesterday featuring their new expansion,

WebbsAuto ribbon cutting

 

1.27.23 - Erectors trimmed the new expansion,

IMG 2023 01 27 15 25 29 042 copy

IMG 2023 01 27 15 25 33 792 copy

IMG 2023 01 27 15 25 49 821 copy

IMG 2023 01 27 15 26 10 030 copy

IMG 2023 01 27 15 27 05 941 copy

IMG 2023 01 27 15 27 17 509 copy

 

11.18.22 - Crewmen poured the foundation for Webb's Automotive's new oil service center. We built Webb's Automotive's origional auto repair and oil change service facility 11 years ago. It is such a blessing to be doing additional work for past customers,

webbs auto pour

webbs auto pour 3

webbs auto pour 4

webbs auto pour 5

Premier Cryogenics | New 26,000 SF 20-ton Crane-served Manufacturing Facility | LaPorte, TX

10.13.22 - Erectors are getting close to closing in the South end of the building,

1

2

4

7

 

9.29.22 - Exterior sheeting and interior insulated sheeting are underway,

7

6

5

9.27.22 - Additional paving is poured. M&M Erectors have erected the steel and are installing the wall sheeting,

1

10

12

9.22.22 - Erectors are assembling and lifting the roof sections,

1

9.19.22 - Erectors are shaking out the steel,

1

2

 

Elite RV | 70,000 SF Concierge Service Storage Center | Waller, TX

7.06.22 - This project is complete,

EliteRV

EliteRV2

EliteRV3

EliteRV4

EliteRV5

EliteRV6

EliteRV 7.06

EliteRV 7.06 2

EliteRV 7.06 3

EliteRV 7.06 4

EliteRV 7.06 5

6.02.22 - Masonry work is underway, in addition to electrical and the office build-out,

IMG 6889

IMG 6880

IMG 6885

IMG 6890

IMG 6894

IMG 6895

IMG 6899

IMG 6902

 

5.11.22 - Canopies are being installed. M&M is trimming out the wash bay building. The asphalt drive is complete,

EliteRV copy

EliteRV2 copy

EliteRV3 copy

EliteRV4 copy

EliteRV5 copy

EliteRV6 copy

EliteRV7 copy

EliteRV8 copy

EliteRV9 copy

EliteRV10 copy

EliteRV11 copy

EliteRV12 copy

EliteRV13 copy

 

3.18.22 - Erectors continue to sheet the building. The concrete crew is scheduled to pour the parking lot next week,

Elite RV 3.18 4

Elite RV 3.18 2

Elite RV 3.18 5

Elite RV 3.18

 

3.02.22 - Erectors continue to hang steel. The pre-assembles are complete and crews are filling in the intermediate bays,

1

7

9

2.15.22 - Erectors are hanging sections of roof,

IMG 3006

IMG 3016

IMG 3019

 

1.19.22 - Crews are pouring the second half of the foundation,

Elite RV 2nd half slab

Elite RV 2nd half slab 4

 

11.11.21 - Site work is underway for Elite RV's new 70,000 SF conceirege service storage center for motorcoaches,

Elite RV rendering

Elite RV rendering aerial

5

6

10

Closner Equipment Co. | New Office, Warehouse, Repair Bays and Wash Bays | Waller, TX

7.06.22 - The pad and utilities are complete. Crews will begin drilling the piers this week,

Closner 7.06

Closner 7.06 2

Closner 7.06 3

Closner 7.06 4

 

5.16.22 - Sitework continues,

IMG 2022 05 16 15 09 46 728

IMG 2022 05 16 15 07 11 795

IMG 2022 05 16 15 07 24 563

IMG 2022 05 16 15 08 23 044

 

5.15.22 - The project consists of erecting 4 buildings for the Closner Equipment Co.

The buildings are Office, Warehouse, Repair Bays, and a Wash Bay.

Total is about 6.5 acres with new grading, drainage, and paving plan. Lot will be fenced with automatic gates installed.

Detention pond had 858 cubic yards of dirt removed per the civil engineering plans for the offset of drained water. This portion of the project is complete.

 

20213 Binford Rd | 20,000 SF Trade School | Waller, TX

6.02.22 - Crewmen are addressing punch out items and the project will be completed by next week,

IMG 6814

IMG 6824

IMG 6822

IMG 6824

IMG 6828

IMG 6832

IMG 6839

IMG 6844

IMG 6846

IMG 6855

IMG 6863

IMG 6865

IMG 6867

 

5.11.22 - This project is complete. Waiting on power,

20213Binford copy

20213Binford2 copy

20213Binford3 copy

 

3.18.22 - The stucco is complete. The ceiling grid installation is underway, and the electricians are installing the lights,

20315 Binford Rd 7

20315 Binford Rd

20315 Binford Rd 3

20315 Binford Rd 4

 

3.02.22 - Crews have made great progress this month. The paving is complete and masonry has begun. Interior crews continue to hang sheetrock,

IMG 3109

IMG 3096

IMG 3094

IMG 3103

2.15.22 - Interior crews are hanging drywall and the concrete crewmen are forming the paving. The excavation of the business park's eastern retention pond is almost complete,

IMG 2992

IMG 2993

IMG 2994

IMG 2995

IMG 2996

IMG 2998

IMG 3002

IMG 3003

IMG 3004

 

1.19.22 - Erectors are sheeting the roof. Framers are framing the walls.

5

4

1

1.04.22 - Erectors are hanging steel for this new facility,

20213 Binford 4

20213 Binford 5

 

12.16.21 - Crews are preparing for the foundation pour,

6

1

 

11.11.21 - Site work is underway for a new 20,000 SF trade school, located at 20213 Binford Rd,

20213 Binford Rd

7

9

13

4129 Katy Hockley Road | 8,600 SF PEMB | Katy, TX

6.02.22 - Power was turned on today, allowing the remaining trades to finish their work,

IMG 6747

IMG 6748

IMG 6749

IMG 6751

IMG 6756

IMG 6761

IMG 6766

IMG 6772

IMG 6803

 

3.03.22 - Interior build out continues. Windows are installed,

IMG 5211

4129 2

4129

 

2.08.22 - The building is sheeted. Erectors are installing the ridge vents. Framers have completed framing the office walls.

IMG 2974

IMG 2976

IMG 2979

 

12.22.21 - The foundation was poured today,

20211222 061204 resized

20211222 064312 resized

20211222 150459 resized

 

7/01/21 - This new 8,600 SF office and warehouse is in permitting. Construction updates will be available on this page, so check back for this location's progress and availablility.  

4129 Katy Hockley Rd thumb

4133 and 4129 Katy Hockley Rd 2

Spec Bldg 3 and 4 aerial

Spec Bldg 3 and 4 front thumb

4133 Katy Hockley Road | 8,600 SF PEMB | Katy, TX

6.02.22 - Power was turned on today. Flooring and the ceiling tile installation will follow,

IMG 6806

IMG 6801

IMG 6798

IMG 6795

IMG 6792

IMG 6790

IMG 6787

IMG 6783

IMG 6781

IMG 6776

9

 

3.03.22 - Interior framing is underway,

4133

4133 2

4133 3

 

2.08.22 - Erectors began hanging the steel today,

4133 2

4133 3

4133 4

4133

7/01/21 - This new 8,600 SF office and warehouse is in permitting. Construction updates will be available on this page, so check back for this location's progress and availablility.  

4129 Katy Hockley Rd thumb

4133 and 4129 Katy Hockley Rd 2

Spec Bldg 3 and 4 aerial

Spec Bldg 3 and 4 front thumb

Premier Cryogenics | Warehouse Bldg with Offsite Parking Lot and Additional Paving 

5.20.22 - Crewmen are pouring the offsite parking lot today,

PCPour3

PCPour2

5.11.22 - Crewmen are forming for the offsite parking lot. The next phases include a warehouse building and paving in the main yard,

PC phaseII 3

PC phaseII 2

Independence Business Park (Finial Group)| 43,000 SF of New Office/Warehouses | Houston, TX

This project includes two ground-up spec office/warehouses totaling 43,000 SF. Scope of project also includes extending the business park's private drive and utilities.  

3.02.22 - Buildings 4 and 8 are completed,

6812 8 Bldg 8 2

6811 4 3

6812 8 Bldg 8 4

6812 8 Bldg 8 5

 

2.18.22 - Wrapping up work on Buildings 4 and 8,

9

5

2

4

6

11

 

12.29.21 - Stucco and masonry to begin. Landscaping continues for Bldg 4 and began today for Bldg 8. Electricians are digging up the underground conduit to AT&T's conduit at both bldgs,

12.29.21 2

12.29.21 3

12.29.21 4

12.29.21

 

12.23.21 - Ceiling tile installation continues for Buildings 4 & 8, fixtures are installed in both buildings, receptacles and can lights are going in today in both buildings, and crews are hooking up the condenser units for Buildings 4 and 8,

12.22.21 2

12.22.21

 

12.16.21 - Flooring continues,

12.16.21 3

12.16.21 2

12.16.21 4

12.16.21 5

12.16.21

11.05.21 - Waiting on one piece of glass to be installed above the door on Building 8. Plumbers are ready for fixtures as soon as the floors are installed. Electrial work continues for both buildings. 

DJI 0726

DJI 0725

DJI 0717

DJI 0706

 

 

 

10.29.21 - The OH door installation continues for Building 8. Plumbers are also installing the water heater and pipe for Building 8. Electricians continue their work on Buildings 4 and 8,

10.29.21

10.29.21 4

10.29.21 6

10.22.21 - Crews cleaned and backfilled around the seven new concrete drainage flumes. Crews are installing lights and ceiling grid in Buildng 4. Waiitng on AC materials for buildings 4 and 8,

Bldg4 1

Bldg4 2

Bldg4 3

Bldg8

Bldg8 3

Bldg8 5

 

9.07.21 - Northwinds crewmen are working to back fill the south side of Bldg 8, next to the drainage ditch, and dress it up. M&M Erectors continue the wall panel installation on Bldg 4,

Screenshot 2021 09 07 094643

Screenshot 2021 09 07 094549

Screenshot 2021 09 07 094706

Screenshot 2021 09 07 094720

Screenshot 2021 09 07 094738

Screenshot 2021 09 07 094752

Screenshot 2021 09 07 095130

 

8.24.21 - Erectors are lifting Bldg #4's roof,

BLDG4

BLDG4 8.24 2

BLDG4 8.24

 

8.18.21 - Paving was poured for Bldg #8. Erectors are lifting Bldg #4,

Bldg 8 paving

Bldg 8 paving 4

Bldg 8 paving 6

Bldg 4

Bldg 4 3

 

7.24.21 - Foundation was poured this morning for Bldg #4,

DJI 0187

DJI 0207

7.02.21 - Crewmen continue to lay out the sub-sub grade in the paving areas around Bldg. 4 & 8, and are cutting to grade to prepare for select fill,

Screenshot 2021 07 06 094600

Screenshot 2021 07 06 094631

Screenshot 2021 07 06 094651

Screenshot 2021 07 06 094703

 

6.25.21 - We are resuming select fill in the paving areas around pad #8. Cutting the paving sub grade in the west end of pad #4 to be able to get a minimum of 8” of select fill and compacted. Plumbers are backfilling trenches.

 

6.12.21 - Windrowing the select fill on Pad 4 and on Pad 8 to help pull the moisture out. Regrading and compacting to get ready for their test on Monday morning. Working on the ditch on the north side of BLDG. 8. Shaping and grading to drain to the pond inlet.

6.12.21

 

6.11.21 - Site crewmen are laying down the select fill that was stock piled yesterday on Pad 4 and began laying down the select fill that was stock piled yesterday on Pad 4. Crews started the first lift on pad 8, compacting in lifts. The plumbers continue working on the 8” water tie in and continued digging their trench. 

6.11.21

 

6.10.21 - Site crewmen began the select fill in Pad 4 and are compacting in lifts.

6.10.21

6.10.21 1

6.09.21 - Crews are cutting bldg. pad 4 & 8 to sub grade (in preparation for select fill). Running the 324 over pad 8 to compact it. Back filling stabilized. Back filling stabilized sand over the 2 culverts. Began the layout and grading on the north side ditch,

6.09.21 1

6.09.21

 

6.08.21 - Cutting bldg. pad 4 to sub grade and starting on pad 8 to prepare for select fill. Running the Roller and 324 over pad 4 to compact it.

6.08.21

6.08.21 1

 

6.07.21 - Starting the 24” & 15” coverts - excavating to grade, building up hdpe bed with stabilized sand, laying the pipe and back fill to 6” from top of pipe for city inspections. Cutting bldg. pad #4 to sub grade to prepare for select fill. 

6.07.21

 

 

Connect Church | New 12,000 SF Facility | Montgomery, TX

1.26.22 - This was such a fun project. Below are final photos of their new church,

IMG 1768

IMG 1666

IMG 1787

IMG 1690

IMG 1704

IMG 1717

IMG 1720

IMG 1710

IMG 1728

IMG 1732

IMG 1714

IMG 1676

IMG 1803

IMG 1644

IMG 1650

IMG 1815

 

 

 

11.20.21 - This project is nearing completion. Floor installation is underway, as interior painting continues. Start-up crewmen are installing AC units. The final clean and completion are scheduled for next week,

IMG 0589

IMG 0532

IMG 0538

IMG 0545

IMG 0548

IMG 0556

IMG 0564

IMG 0569

IMG 0570

IMG 0572

IMG 0578

IMG 0579

IMG 0580

IMG 0583

IMG 0585

 

 

11.10.21 - Electricians are tieing in homeruns and pulling wire into the sanctuary, bathroom tile installation continues, and masons continue bricking the exterior. Erectors began trimming the building and plumbers set 5 septic tanks,

20211110 084810 photo 20211110 084800

20211108 071738 photo 20211108 071700

20211027 133438 photo 20211027 083400

20211027 133510 photo 20211027 083500

20211027 133525 photo 20211027 083500

20211028 131710 photo 20211028 081700

20211102 122947 photo 20211102 072900

20211104 140445 photo 20211104 090400

20211108 071524 photo 20211108 071500

20211109 071746 photo 20211109 071700

20211028 131810 photo 20211028 081800

20211110 084625 photo 20211110 084600

 

 

10.19.20 - The ceiling grid is installed and door frames are being installed,

ConnectChurch10.19 3

ConnectChurch10.19 10

ConnectChurch10.19 2

ConnectChurch10.19 4

ConnectChurch10.19 5

ConnectChurch10.19 6

ConnectChurch10.19 7

ConnectChurch10.19 8

ConnectChurch10.19 9

ConnectChurch10.19 11

ConnectChurch10.19 13

ConnectChurch10.19 14

ConnectChurch10.19 15

ConnectChurch10.19 16

ConnectChurch10.19

 

 

10.15.21 - The electricians are pulling wire as additional crews clean the site and reset the silt fence. The data wire is also being run.

20211015 121605 photo 20211015 071500

20211015 121632 photo 20211015 071600

20211015 121653 photo 20211015 071600

20211015 121713 photo 20211015 071700

20211015 122326 photo 20211015 072300

20211015 122340 photo 20211015 072300

20211015 122355 photo 20211015 072300

20211015 122424 photo 20211015 072400

 

9.12.21 - The glass is installed. Drywall, electrical, and HVAC work continue,

IMG 5736

IMG 5739

IMG 5748

IMG 5698

IMG 5751

IMG 5754

IMG 5709

IMG 5710

IMG 5711

IMG 5713

IMG 5714

IMG 5717

 

9.02.21 - Framers are hanging drywall. HVAC crewmen are hanging the ductwork,

IMG 2374

IMG 2375

IMG 2377

IMG 2384

IMG 2385

IMG 2386

IMG 2390

 

8.24.21 - The exterior walls are up and interior framing and buildout are underway,

 1946238176 20210824 151228 3137053 resized

1515713178 20210824 151145 3306461 resized

 89960966 20210824 151453 2315671 resized

 146295747 20210824 151434 2853758 resized

 918953949 20210824 151825 2866278 resized

 1118763360 20210824 151305 3651506 resized

 

8.04.21 - Erectors have progressed to hanging the pre-assembled roof sections,

8.04.21 10

8.04.21 7

8.04.21

 

8.02.21 - Erectors are into their second day hanging steel,

IMG 3565

IMG 3578

IMG 3593

IMG 3591

 

7.23.21 - The foundation is cured and saw cut. Steel delivery is scheduled for tomorrow,

ConnectChurch7.27 2

ConnectChurch7.27 3

ConnectChurch7.27 4

ConnectChurch7.27 5

ConnectChurch7.27

 

7.22.21 - Crews began pouring the foundation for the church building this morning,

ConnectChurchPour5

ConnectChurchPour11

 

7.01.21 - Crews laid out form boards, and finished digging grade beams. Electricians are working on underground electrical for the foundation.

ConnectChurch7.01

ConnectChurch7.01 2

6.30.21 - Electricians are laying out the underground electrical,

20210630 152021 photo 20210630 102000

20210630 152054 photo 20210630 102000

20210630 152103 photo 20210630 102100

20210630 152234 photo 20210630 102200

 

6.26.21 - The plumbers continue underground plumbing,

20210626 125234 photo 20210626 075200

20210626 125248 photo 20210626 075200

20210626 125350 photo 20210626 075300

6.24.21 - Underground plumbing continues,

20210624 153523 photo 20210624 103500

20210625 152216 photo 20210625 102200

20210625 152246 photo 20210625 102200

 

6.22.21 - Crewmen cleared shrubs along the drive for the future sign. Additional crews spread lime to speed the drying time of the job site, and laid out grade beam locations,

20210622 141801 photo 20210622 091700

20210623 145709 photo 20210623 095700

 

6.18.21 - Crewmen drilled and poured piers. Electricians installed conduit for light poles.

20210618 151251 photo 20210618 101200 copy

20210618 151205 photo 20210618 101200

 

5.14.21 - Curbs were poured for the parking area and have cured,

ConnectChurch curbs

ConnectChurch curbs2

ConnectChurch curbs3

ConnectChurch curbs4

 

4.27.21 - Crewmen are pouring the parking areas today,

CChurchPavingPour4.27.21 6

CChurchPavingPour4.27.21 24

 

3.16.21 - Crewmen continue their work on the pond outfall, digging out the second box, with stabilization, rest box and pipe, backfill, and dress up,

20210315 134322 photo 20210315 134300

20210315 091243 photo 20210315 091200

20210315 130913 photo 20210315 130900

20210315 130922 photo 20210315 130900

 

1.12.21 - Site crewmen continue excavating the detention pond and grading the site,

8

6

4

12.23.20 - Crews are clearing the site to prepare for the church's building pad,

ConnectChurch12.23 2

ConnectChurch12.23 3

ConnectChurch12.23 4

 

Sitework will soon begin for Connect Church's new 12,000 SF facility. The new church facility will include a sactuary, class rooms, and administrative offices,

02.1 Elevation

03.1 Interior sanctuary

Word of God Christian Fellowship Church | Sidewalk Extension | Cypress, TX

8.24.21 - The sidewalk extension is complete for the Word of God Christian Fellowship Church congregation,

5

4

3

Engineered Air Balance Co., Inc. | Remodel | Dallas, TX

7.16.21 - Photos of the completed project,

EAB 8

EAB 9

EAB 3

EAB 4

EAB 5

EAB 6

EAB 7

EAB 10

EAB 12

EAB 13

EAB 14

EAB 15

EAB 16

 

6.25.21 - Crews finished addressing the punch out items for this project.

EAB Final4 copy

EAB Final

EAB Final2

EAB Final3

EAB Final5

6.23.21 - Hanging generator enclosure doors and painting.

EAB

EAB 2

EAB 3

EAB 4

 

6.04.21 - Prepping for Generator pad pour,

EAB 6.04.21

6.02.21 - Electrical final called in for tomorrow.

EAB 6.02

6.01.21 - Started dropping ceiling tile and began final clean. Fire Marshall performed visual and hydro test. Approved to cover ceiling.

5.29.21 - Electricians are hanging lights, hanging new exterior wall packs

5.26.21 - Passed ADA inspection. Restroom stall doors are hung with hardware installed,

EAB 5.26.21

5.25.21 - Flooring crews are setting core base and addressing punch items. Fire Marshall visual is scheduled for June 1st. Furniture delivery is scheduled for June 7th.

5.24.21 - Electricians are labeling and tracing circuits. Concrete crew in to form and pour lab trough.

5.20.21 - Painters are painting out the walls. Plumber added a check valve on the circulating line. Electricians installed wiremold and plates.

5.19.21 - Crews are setting all window blinds. Painters are painting out all walls.

5.17.21 - Restroom mirrors are installed. Bad gaskets have been relaced on exterior windows. Glass sidelites are set. Electricians are setting devices. Painters are applying final coat.

5.14.21 - Crews are installing lavatories in break room and the copy room. Plumbers are finishing their fixture installations. Electricians are setting two fixtures in the restrooms,

EAB 5.14 2

EAB 5.14 3

EAB 5.14 7

EAB 5.14 4

EAB 5.14 5

EAB 5.14 6

EAB 5.14

 

5.04.21 - Electricians are tying in the lights. Sprinkler heads are being installed. Tile installation is underway in the restrooms and front store wall. Carpet is being installed on the West side.

EAB 5.04 2

EAB 5.04 3

EAB 5.04 4

EAB 5.04 5

EAB 5.04

 

5.03.21 - HVAC removed the existing rooftop units (RTUs) and set new RTUs. They also ran condensate lines, insulated vav's and copper linesets. Electricials set light fixtures and dropped whips into fixtures, and set pub panels in the electrical room. Fire sprinklers are being installed on grid, and the ceramic tile is being installed in the restrooms, and west office areas. The roofers started cricket on the North side, and are repairing the roof areas in the NE corner,

2021 05 03T08 00 37.000Z

2021 05 03T10 00 25.000Z

 

4.28.21 - Plumbing and Electrical rough-in are complete. Walls are taped and floated. Drywall crew are installing the ceiling grid. IT contractor is running data cabling,

9

8

10

2

 

3.16.21 - Crewmen began hanging duct work, and are saw cutting areas of slab to be removed for plumbing and electrical,

IMG 0327 20210316 031500

IMG 0326 20210316 031500

IMG 0325 20210316 031500

 

3.11.21 - This project includes remodeling 9,188 SF of office, 273 SF of lab space, and 679 SF of warehouse.

4121 Katy Hockley Rd | 9,300 SF PEMB | Katy, TX

4.20.21 - The rock and concrete work are completed. Fence installation and clean up remain.

1

2

4.05.21 - Crewmen continue cutting grade,

4.05.21

4.05.21 2

3.26.21 -  Site crew began scraping for a new rock yard at 4121 Katy Hockley Rd. This is part of the new tenant’s improvemnets,

IMG 8014

IMG 8020

 

2.06.20 - This project is complete,

IMG 3668

IMG 3669

IMG 3671

IMG 3672

IMG 3673

IMG 3676

IMG 3679

IMG 3680

IMG 3682

 

12.15.19 - The building is fully trimmed. Flooring began in the entry,

IMG 8604

IMG 8607

IMG 8609

IMG 8612

IMG 8613

IMG 8616

IMG 8618

IMG 8620

IMG 8621

IMG 8624

IMG 8627

IMG 8630

IMG 8636

 

12.03.19 - Painting is complete and flooring will soon follow,

IMG 3503

IMG 3512

IMG 3513

IMG 3514

IMG 3515

IMG 3516

IMG 3517

IMG 3518

 

 

10.05.19 - Sheeting is underway,

IMG 7232

IMG 7234 

9.27.19 - Parking lot is poured. Erectors are hanging steel,

IMG 8724

IMG 8725

 

9.24.19 - Crews are erecting the building. More paving has been poured,

IMG 3333

IMG 3889

IMG 3890

 

9.12.19 - The building pad was poured and crews are forming for additional paving,

IMG 8598

IMG 8597

IMG 8600

IMG 8602

IMG 8603

 

7.16.19 - Crews are pouring the main drive,

IMG 3160

 

7.11.19 - Crewmen began building the pad and laying out the private road for the business park,

IMG 8122

IMG 8123

IMG 8126

IMG 8127

IMG 8128

 

6.28.19 - Sitework is underway for this new 9,300 SF office/warehouse, located off Katy Hockley Road and Clay Road. This new facility is available for Sale or Lease,

IMG 7812

IMG 7829

KH Exterior aerial2 4121 thumb