twitter facebook linkedin

More than 30 years
of experience in Texas

previous arrow
next arrow
Slider

Northwinds Construction

View important updates by Northwinds Construction

Joe's Burgers and Subway Restaurants

IMG 3088
IMG 3089
IMG 3090
IMG 3091
IMG 3092
IMG 3093
1
2
3
4
4
1
2
1
2
3
4
5
6
IMG 7756
IMG 7757
IMG 7760
IMG 7761
joes
joes3
joes4
joes5
subway
IMG 7603
IMG 7608
IMG 7609
IMG 7610
IMG 7555
IMG 7557
IMG 7558
IMG 7513
IMG 7514
IMG 7515
IMG 7516
1
2
3
4
5
IMG 2904 thumb
IMG 2905

Traders Village | 4,000 SF Freestanding Joe's Burgers Restaurant / 4,000 SF Freestanding Subway Restaurant | Houston, TX

6.07.19 - Crewmen are installing hat channels for Joe's Burgers, and hanging steel for Subway,

6.03.19 - Crews have been addressing the CMU installation, setting embedded plates for the bar joists, and filling walls with concrete. As for Joe's Burgers, crewmen are laying out the roof curbs for the AC and vents, cutting AC access and welding angle supports, framing, and pouring interior curbs. Electrical rough-in is also underway. 

 

Continue reading
  565 Hits
565 Hits

Hoelscher Weatherstrip Manufacturing Co.

Hoelscher Weatherstrip | 192,000 SF Tiltwall Warehouse and 21,000 SF Office | Tomball, TX

6.03.19 - The building pad is 95% complete,

1

2

3

4

 

4.29.19 - The storm sewer is complete. The building pad has one lift, with two more to go,

4

7

14

15

16

 

4.09.19 - Crewmen are laying the storm on the North end. The building pad is 90% to start of fill elevation. The fire line and fire hydrant are set and approved by the fire marshall, and the domestic water tap and meter are set,

2

8

7

21

5

6

11

12

3.25.19 - Crews have completed the Stom on the South end, with the exception of tying into the downspout drains. Crews have hauled in  26 loads to tighten the SE corner of the building pad. The Storm on the East and NE side of the building is complete,

5

6

7

8

10

11

 

3.22.19 - Crews continue the mass grading and have laid approximately half of the strom drainage pipe,

IMG 7541

IMG 7542

IMG 7543

IMG 7544

IMG 7545

IMG 7546

IMG 7547

IMG 7548

3.11.19 - Storm on the south end is complete. Bringing in select fill for pad,

1

3

20190311 091142

20190311 091214

20190311 092221

2.27.19 - The brush grinding is complete. The storm on the south end is tied into the street inlet. South storm is 75% complete. Crewmen dug ditches around the building pad area to help release trapped water, and to more quickly dry the areas of saturated soils,

1

2

3

4

5

6

7

8

9

2.16.19 - Crews are installing the storm sewer and dewatering the site,

1

2

3

4

5

6

7

8

9

12

 

1.10.19 - Crewmen began clearing trees,

IMG 7254

IMG 7255

IMG 7257

IMG 7259

 

12.27.18 - Silt fencing is installed.

 

12.17.18 - Excavation is scheduled to begin in January. 

Hoelscher Gray1

Hoelscher Gray3

Hoelsher Gray 02

 

 

 

 

 

 

Continue reading
  1273 Hits
1273 Hits

Johnson Supply

IMG 2720
IMG 2721
IMG 2713
IMG 2714

Johnson Supply | 10151 Stella Link Road Office Remodel | Houston, TX

1.10.19 - LED lights are in and display slatwall is in. Crewmen will next address the ceiling tile and paint.

 

1.09.19 - Crewmen began their work on this project last Monday. Crewmen are to replace the ceiling, install slatwall for inventory displays, install new LED 2x4 lights, repaint, replace electrical devices and receptacles, repair and refinish the sales counter, and replace sales doors to warehouse doors,

Continue reading
  381 Hits
381 Hits

Spectrum of Hope Bldg 3 Parking Expansion

IMG 5882
IMG 5883
IMG 7041
IMG 7042
IMG 7043
IMG 7045
IMG 7046

Spectrum of Hope Building 3 | 20,000 SF Parking Lot Expansion | Cypress, TX

12.14.18 - Subgrade is complete. Crews began forming the parking lot expansion,

 

12.03.18 - Site crew is laying out and cutting grades,